Location:
Regina, Saskatchewan
Client:
SaskTel
Completed:
Ongoing (Started 2016)
Service Categories:
Engineering, Wireless Infrastructure, RF Design, Field Operations, Network Optimization, 5G Upgrades
Overview
Since 2016, Comtech has partnered with SaskTel to design, deploy, and support wireless infrastructure at Mosaic Stadium. The project began as a Greenfield design-build initiative and continues today through ongoing network optimization, maintenance, and 5G upgrades.
Comtech delivered a turnkey solution that included RF modeling, network design, installation, integration, testing, and commissioning. Designed to support high-attendance events, the system provides reliable wireless coverage and network performance throughout the stadium.
Through ongoing modernization and operational support, Comtech continues to help ensure the infrastructure remains scalable, reliable, and ready to meet evolving connectivity demands.
Project Highlights
- RF Modeling & Coverage Analysis
- Wireless Network Design
- Greenfield Design-Build Deployment
- Infrastructure Installation & Integration
- System Testing & Commissioning
- Network Optimization & Performance Improvements
- Ongoing Maintenance & Operational Support
- 5G Upgrades & Network Modernization
Project Summary
A long-term wireless infrastructure partnership that demonstrates Comtech’s ability to deliver, optimize, and support high-capacity communications networks in complex public venues.